Water-Related News

Bonita Springs awards contract for Logan Boulevard Regional Floodway drainage project

The City Council of Bonita Springs has approved city staff’s recommendation to award Singhofen & Associates Inc RFQ 20-04 and proceed with the development of a hydrologic study and construction plans for the Logan Boulevard Regional Floodway Drainage Project. A Request for Qualifications posted on March 11, 2020, for the design of the study and construction plans. The City received seven 7 proposals on June 2, 2020.

The Selection Committee met on July 13, 2020 and evaluated the submitted proposals and on July 29, 2020, and recommended Singhofen & Associates as the top-ranked firm.

The City proposes to improve the drainage in the subdivisions of Worthington, Palmira Golf Club and Village Walk in Bonita Springs and the Imperial Watershed at large. The project limits are located on the eastern boundary of Radio Tower Boulevard, continuing under Bonita Beach Road and along the eastern boundary of Logan Boulevard within the existing conveyance. The professional services scope will consist of, but not limited to, surveying, engineering, drainage study, design, plans preparation, permitting and bidding for the proposed project. No construction activities are included in this request. The proposed plans will implement measures to improve the drainage in the subdivisions of Worthington, Palmira Golf Club and Village Walk of Bonita Springs and the Imperial Watershed at large. Analysis and construction plans shall consist of improving the existing stormwater system by installing pipes, control structures and open ditches.